Resources

|

October 19, 2017

Wärtsilä Case Study

Find out how Wärtsilä uses Visual Components to support the complete lifecycle of new investment projects.

Key Benefits

  • Accelerated ramp-up period of new projects.
  • Faster delivery times.
  • Significant cost savings.

“We were not just looking for a powerful tool to simulate robot activities, but something that could simulate the entire production chain. For this, Visual Components was the best tool.”

– Tero Kujamäki, Project Manager for Marine Solutions – Wärtsilä’s Delivery Centre Development

Share this article

a rendering of a manufacturing line

In search of an easy to use 3D simulation solution

Wärtsilä, a global leader in advanced technologies and complete lifecycle solutions for the marine and energy markets, was first introduced to Visual Components in 2008. Tero Kujamäki, Project Manager for Marine Solutions at Wärtsilä’s Delivery Centre Development (DCD), was working with the Seinäjoki University of Applied Science to create 3D simulations of an automated cylinder head assembly line with Visual Components software.

“We were planning a new cylinder head assembly line and wanted to create a simulation model of the process,” said Tero. “We used Visual Components to create a simulation video of the automated line and validate our calculations for capacity and phase time.”

Simulation of a cylinder head assembly line

As the strategic planning arm of Wärtsilä’s Delivery Centre Vaasa (DCV), the DCD is responsible for planning DCV production development activities over 5-10 year periods. They investigate new production technologies and plan major investments in new production centers.

Tero and his team had previously evaluated other manufacturing simulation software solutions, but found them too complex and resource intensive. For an organization that’s constantly exploring new production solutions, they needed a solution that could keep up with their fast pace; a tool that could quickly create and simulate production concepts, but also be used for more in-depth analysis.

“We were not just looking for a powerful tool to simulate robot activities,” said Tero, “But something that could simulate the entire production chain.”

“For this, Visual Components was the best tool.”

The experience with Seinäjoki University left Tero and his team convinced that Visual Components fit their needs. The simulation videos and layouts they created of the assembly line were very impactful (the investment recommendation was approved), and Wärtsilä began using Visual Components shortly after.

We were not just looking for a powerful tool to simulate robot activities, but something that could simulate the entire production chain. For this, Visual Components was the best tool.

Tero Kujamäki, Project Manager for Marine Solutions – Wärtsilä’s Delivery Centre Development

Optimizing the project lifecycle with 3D manufacturing simulation

The DCD initially used Visual Components to design layouts and simulations of production lines – investment projects being considered by Wärtsilä. As Tero and his team explored the capabilities of Visual Components, they started using it for more applications, including robot cell simulation, design analysis, and creating training materials.

Wärtsilä now uses Visual Components to support the complete lifecycle of new investment projects, from ideation and concept design to technical validation and implementation. The main benefits that Tero and his team have seen with Visual Components are improvements in production performance, communications, and implementation.

“As a project manager, about 90% of my job is communication,” said Tero. “That’s why Visual Components is the perfect tool for us. We can easily and concretely show the effects of design changes to the overall process, and share that information with both technical and non-technical people.”

As a project manager, about 90% of my job is communication. That’s why Visual Components is the perfect tool for us. We can easily and concretely show the effects of design changes to the overall process, and share that information with both technical and non-technical people.

Tero Kujamäki, Project Manager for Marine Solutions – Wärtsilä’s Delivery Centre Development

Achieving bottom line impact

10 years later, Tero and his team have seen positive results since first introducing Visual Components to Wärtsilä, specifically in the areas of production design and project implementation.

The production solutions Wärtsilä builds are highly automated and use advanced equipment and robotics. While the machines on their factory floors are state-of-the-art, prior to using Visual Components, Tero and his team knew their production lines weren’t optimally designed. They were able to squeeze much more performance out of production solutions designed with Visual Components, leading to projects with much more financially attractive returns.

Simulation of a connecting rod assembly line

Once a project is approved, there is intense pressure for it to be delivered and commissioned quickly. There are always implementation challenges with projects of this scope and complexity; but with Visual Components, the DCD saw an opportunity to accelerate the ramp-up period of new projects. Tero and his team used Visual Components to plan and coordinate implementation with project stakeholders, using layouts, 3D models, and simulations to communicate project timelines, milestones, and end-states. This resulted in shorter ramp-up periods, faster delivery times, and significant cost savings for Wärtsilä.

“Previously, we used 2D drawings or Excel spreadsheets to map and describe our processes, which wasn’t always easy for us to communicate to others,” said Tero. “We now use 3D models and simulations, which helps stakeholders more quickly understand our technical proposals, and saves us time from having to explain complex calculations.”

“Visual Components is now our standard when planning projects and processes.”

Visual Components is now our standard when planning projects and processes.

Tero Kujamäki, Project Manager for Marine Solutions – Wärtsilä’s Delivery Centre Development

Exploring the digital and virtual frontiers

Wärtsilä continues to work on exciting projects that advance their marine and energy production capabilities. The next big thing: factory digitalization. Tero and his team are exploring how to digitize Wärtsilä’s production operations. The DCD sees significant opportunity in factory digitalization, specifically with the ability to create a digital twin of their factories, to simulate changes and upgrades to production lines before deploying them. Considering the scale and complexity of their factories, Tero expects this would save Wärtsilä significant time and expense in planning and implementation of future projects.

“As production development is one of our key areas at the Vaasa factory, we have to explore new tools and methods that can help us take the next steps in all of our development areas,” said Tero. “Pre-digitalization has been an active development area for us the past 10 years and we understand the benefits for this quite well.”

“We already have a partial environment for factory digitalization that’s working, we now need to achieve integration between existing tools at scale.”

As an early user of Visual Components Virtual Reality (VR), Wärtsilä also sees a lot of potential in VR for their planning projects. In addition to being able to experience new production concepts in full-scale, Tero and his team are excited about how it will enable a much richer training experience, and how it can improve stakeholder engagement and collaboration on future projects.

“We’re excited about how VR will allow us to better support the end-users of our production solutions before they’re commissioned,” said Tero. “We think there’s great potential for training end-users and operators in a VR environment so we can further reduce ramp-up time for new projects.”

We’re excited about how VR will allow us to better support the end-users of our production solutions before they’re commissioned.

Tero Kujamäki, Project Manager for Marine Solutions – Wärtsilä’s Delivery Centre Development

ABOUT Wärtsilä

Wärtsilä is a global leader in advanced technologies and complete lifecycle solutions for the marine and energy markets. By emphasizing sustainable innovation and total efficiency, Wärtsilä maximizes the environmental and economic performance of the vessels and power plants of its customers. In 2016, Wärtsilä’s net sales totaled EUR 4.8 billion with approximately 18,000 employees. The company has operations in over 200 locations in more than 70 countries around the world.